And here is a partial outline of all the stuff to get done this weekend. We'll have it posted around the Hideout this weekend and people can take on projects in a sensible way.
Forgive my inability to format this better:
1. Cleaning
2. Organizing the greenroom
3. Refit the light booths with cables and connectors for the sound systems
4. Upstairs sound booth computer
5. Lighting instruments
6. Upstairs stage chairs
7. Reorganizing the upstairs theater stuff
8. Replace running lights in stairwell
9. Restock the upstairs bathroom supplies
10. Organize the box office
11. Replace the ink in the credit card machine
12. Pull down the crappy table in the downstairs backstage
13. Resupply the upstairs utility closet
14. Replace filters on the AC units
15. Replace the upstairs toilet
16. Hang more pictures and posters in the stairwell
17. Reorganizing under the lightbooth upstairs
18. Replace the bulbs in the track lights above the stairs
19. Repair the nasty patch of leaky ceiling at the bottom of the stairs
20. Repair the broken corner of the wall at the bottom of the stairs
21. Fix the upstairs stage left curtain leg
22. Get the Hideout's wireless up and running again
23. Paint the upstairs audience risers black
24. Paint the downstairs audience risers black
25. Repaint benches black
26. Hang a black cloth over the upstage door behind the upstairs theater
27. Clean the men's room downstairs
28. Take down the projector screen in the upstairs theater
29. Take down the Christmas lights in the upstairs theater
30. Create signage for the front, box office, theaters and bathrooms
31. Paint the back wall of the upstairs light booth black
32. Paint the back wall of the upstairs theater black
33. Move the lobby piano under the risers
34. Update the poster case in the front of the Hideout
35. Put curtains on the open ends of the audience risers upstairs
36. Install a new white board if we can't clean the old one
37. Steam clean the audience seats in both theaters
Forgive my inability to format this better:
1. Cleaning
2. Organizing the greenroom
3. Refit the light booths with cables and connectors for the sound systems
4. Upstairs sound booth computer
5. Lighting instruments
6. Upstairs stage chairs
7. Reorganizing the upstairs theater stuff
8. Replace running lights in stairwell
9. Restock the upstairs bathroom supplies
10. Organize the box office
11. Replace the ink in the credit card machine
12. Pull down the crappy table in the downstairs backstage
13. Resupply the upstairs utility closet
14. Replace filters on the AC units
15. Replace the upstairs toilet
16. Hang more pictures and posters in the stairwell
17. Reorganizing under the lightbooth upstairs
18. Replace the bulbs in the track lights above the stairs
19. Repair the nasty patch of leaky ceiling at the bottom of the stairs
20. Repair the broken corner of the wall at the bottom of the stairs
21. Fix the upstairs stage left curtain leg
22. Get the Hideout's wireless up and running again
23. Paint the upstairs audience risers black
24. Paint the downstairs audience risers black
25. Repaint benches black
26. Hang a black cloth over the upstage door behind the upstairs theater
27. Clean the men's room downstairs
28. Take down the projector screen in the upstairs theater
29. Take down the Christmas lights in the upstairs theater
30. Create signage for the front, box office, theaters and bathrooms
31. Paint the back wall of the upstairs light booth black
32. Paint the back wall of the upstairs theater black
33. Move the lobby piano under the risers
34. Update the poster case in the front of the Hideout
35. Put curtains on the open ends of the audience risers upstairs
36. Install a new white board if we can't clean the old one
37. Steam clean the audience seats in both theaters
Last edited by acrouch on August 10th, 2007, 12:11 pm, edited 2 times in total.
- kbadr Offline
- Posts: 3614
- Joined: August 23rd, 2005, 9:00 am
- Location: Austin, TX (Kareem Badr)
- Contact:
No chance of getting gels?acrouch wrote:# Lighting instruments
1. make a list of how many lamps (bulbs) we need and on which instruments
2. order new lamps
3. pull out working instruments from under the upstairs booth and hang them
4. figure out if we can use any of the lamps we have
You work your life away and what do they give?
You're only killing yourself to live
- beardedlamb Offline
- Posts: 2676
- Joined: October 14th, 2005, 1:36 pm
- Location: austin
- Contact:
here are some list items we came up with in our meeting earlier this evening.
- paint the risers black in both theatres.
- take a microphone inventory. # of mics, cables, and stands.
- paint all benches and chairs black.
- don't worry about painting the stages.
- put a black drop over the center door in between the set and the door in the upstairs space to cover the more upstage doorway.
- please please please clean the men's room downstairs. i know it's not technically our turf, but our customers use it and it's really disgusting.
- take the projector screen down in the upstairs theatre.
- clean the backstage of the upstairs theatre.
- take down the x-mas lights in the upstairs.
- devise, purchase supplies for, and install a sweet, consistent system of signage for the box office, locations of theatres, and maybe even the bathrooms.
- paint the back wall of upstairs light booth black.
- paint back wall of upstairs theatre black.
- move the lobby piano under the risers.
- update the poster box just outside the front door downstairs.
- curtainize the ends of the risers in the upstairs space.
- bring raid or some other insect killing spray and spray one of those bugs whenever you see one.
- install new set of wipe boards and toss the old one.
- throw away all permanent markers in the building.
- hide the giant die in the classroom.
- vacuum or steam clean any seat with a clothy cushion in both theatres.
thanks, ya'll. let's get her in shape for the fall and oob.
- paint the risers black in both theatres.
- take a microphone inventory. # of mics, cables, and stands.
- paint all benches and chairs black.
- don't worry about painting the stages.
- put a black drop over the center door in between the set and the door in the upstairs space to cover the more upstage doorway.
- please please please clean the men's room downstairs. i know it's not technically our turf, but our customers use it and it's really disgusting.
- take the projector screen down in the upstairs theatre.
- clean the backstage of the upstairs theatre.
- take down the x-mas lights in the upstairs.
- devise, purchase supplies for, and install a sweet, consistent system of signage for the box office, locations of theatres, and maybe even the bathrooms.
- paint the back wall of upstairs light booth black.
- paint back wall of upstairs theatre black.
- move the lobby piano under the risers.
- update the poster box just outside the front door downstairs.
- curtainize the ends of the risers in the upstairs space.
- bring raid or some other insect killing spray and spray one of those bugs whenever you see one.
- install new set of wipe boards and toss the old one.
- throw away all permanent markers in the building.
- hide the giant die in the classroom.
- vacuum or steam clean any seat with a clothy cushion in both theatres.
thanks, ya'll. let's get her in shape for the fall and oob.
Thanks to everyone for the metric crap-ton of stuff that got done this past weekend. The Hideout looks fantastic.
Notably, we have a new, fully functional toilet in the freshly cleaned upstairs bathroom thanks to Joanna "Handychick" Cash. Do YOU need a new toilet? Throw her some business at http://www.handychicks.com/
And Arthur of ColdTowne fixed the missing ceiling panel and cracked, chipping corner at the bottom of the stairwell. Shows and classes at http://coldtowne.com/Coldtowne_theater.
Jason Vines rewired the upstairs and downstairs light booths. Don't mess them up or he'll come after you.
And everyone else too numerous to single out did many many essential things and are owed an eternal debt of thanks.
But of course there's always more to do. So if you have any spare time over the next couple weeks and you'd like to pitch in a little extra after the fact, you could:
-Sweep the classroom (moving all the stuff away from the walls to do so)
-Mop the classroom
-Wipe down the walls and baseboards in the classroom
-Add music to the upstairs light booth computer
-Organize the iTunes on the upstairs light booth computer
-Work with Sean to get the Hideout wireless working again (email me and I'll put you in touch with him)
-Mount the new white boards in the classroom greenroom (make sure to find studs; they're heavy)
-Paint the new panel and corner at the bottom of the stairwell (the red paint and painting supplies are in the classroom utility closet)
Notably, we have a new, fully functional toilet in the freshly cleaned upstairs bathroom thanks to Joanna "Handychick" Cash. Do YOU need a new toilet? Throw her some business at http://www.handychicks.com/
And Arthur of ColdTowne fixed the missing ceiling panel and cracked, chipping corner at the bottom of the stairwell. Shows and classes at http://coldtowne.com/Coldtowne_theater.
Jason Vines rewired the upstairs and downstairs light booths. Don't mess them up or he'll come after you.
And everyone else too numerous to single out did many many essential things and are owed an eternal debt of thanks.
But of course there's always more to do. So if you have any spare time over the next couple weeks and you'd like to pitch in a little extra after the fact, you could:
-Sweep the classroom (moving all the stuff away from the walls to do so)
-Mop the classroom
-Wipe down the walls and baseboards in the classroom
-Add music to the upstairs light booth computer
-Organize the iTunes on the upstairs light booth computer
-Work with Sean to get the Hideout wireless working again (email me and I'll put you in touch with him)
-Mount the new white boards in the classroom greenroom (make sure to find studs; they're heavy)
-Paint the new panel and corner at the bottom of the stairwell (the red paint and painting supplies are in the classroom utility closet)
- kbadr Offline
- Posts: 3614
- Joined: August 23rd, 2005, 9:00 am
- Location: Austin, TX (Kareem Badr)
- Contact: